二、Scheduling Criteria
      



     1. Maximum CPU Utilization
     
Keep the CPU as busy as possible.

     2. Maximum
throughput

    
3. Minimize the maximum response time

     4. Minimize turnaround time

     5. Minimize average waiting time
      Waiting time : The sum of the period spent waiting in the ready queue.

     6. Minimize the variance in the response time

     7. Be fair

     8. Maximum the number of interactive users

     9. Minimize system overhead

     10. Blance resources used




      